
- In late October, Chairman Zhang Xiaobo led a team to the EPC project site of the Third Solid Waste Disposal Center (Phase 1) in Hangzhou, visited the project owner, Hangzhou Linjiang Environmental Energy Co., Ltd., and its parent company, Hangzhou Environmental Group, and had a friendly meeting with Chairman ...[more]
- > An Opening Ceremony was Held for Construction of the Largest Underground Lead and Zinc Mine Project in Jiangxi Province
- > Chifeng Yunnan Copper Designed by China Nerin Was Successfully Put into Operation
- > A 300kt/a Copper Smelting Project of Nanguo Copper (Phase I) Designed by China Nerin has been Successfully Put into Production at its First Testrun
- > China Nerin Held the 2019 Annual Working Meeting
- > An EPS Project for HVL Smelter Offgas Handling delivered by China Nerin to ENAMI has been Successfully Commissioned
- > Vice President Fang Tiansan in Myanmar Attending a Ceremony to Celebrate Full Production of Letpadaung Copper Mine
- > Dr. Shen Louyan and Mr. Wang Wei from China Nerin were elected the “National Design Master of Geotechnical Investigation and Engineering in Nonferrous Metals Industry”
- > China Nerin Has Successfully Signed a Contract for Engineering Design of DAIRI Lead and Zinc Project in Indonesia
- > China Nerin President Wu Runhua Led a Delegation to Attend the Seminario FURE 2018 in Chile
- > NERIN attends EXTRACTION 2018 in Canada
Total 52 Page 2/6