">

Metallurgy

Wuzhou 300kt/a Secondary Copper Smelting Project

Time:2013-08-22 19:52:02      Edit:NERIN      Source:nerin.com      Hits:



 

With scrap copper as feed to produce cathode copper, using NGL furnace process and stainless steel cathode for electrolysis
Awarded the Second Prize of the National Excellent Project Consultation and First Prize of Excellent Design of Ministerial Level

XML 地图 | Sitemap 地图